Jobless Developer
Fluidstack logo

Open since May 2026

Data Center Construction ManagerFluidstack · Austin

Data Center Construction Manager

AustinRemoteFull-time$120k–$200k

AI Summary

Manages day-to-day execution of green-field and brown-field GPU data center builds worldwide, orchestrating contractors, trades and vendors to deliver safe, on-schedule, on-budget facilities that meet extreme power-and-cooling density targets.

About this role

About Fluidstack

At Fluidstack, we build the compute, data centers, and power that will fuel artificial superintelligence. We supply GWs of compute capabilities to the world’s biggest AI Labs at industry-defining speeds.

Our team is small, fast, and obsessed with quality. We own outcomes end-to-end, challenge assumptions, and treat our customers' problems as our own. No task is beneath anyone here.

There are a few thousand people who will shape the trajectory of superintelligence. Come and be one of them.

About the Role

The Data Center Construction Manager owns day-to-day site execution for green-field and brown-field GPU data-center builds worldwide. You will orchestrate general contractors, trades and vendors to deliver safe, on-schedule, on-budget facilities that meet Fluidstack’s extreme power-and-cooling density targets.

Focus

  • Build, maintain, and execute integrated schedules (Primavera P6, MS Project) covering design, procurement, construction and commissioning.

  • Enforce Fluidstack’s safety program; drive zero-incident culture across all subcontractors.

  • Coordinate CSA and MEP trades, resolving field conflicts in real time.

  • Track and report daily progress, spend, earned value and resource loading; issue recovery plans when needed.

  • Verify on-site QA/QC, material submittals, RFI and change-order processes.

  • Interface with Design, Procurement, Commissioning and Operations teams to ensure seamless hand-offs.

  • Lead development of scopes of work and technical exhibits for critical path trades and packages.

  • Manage execution of construction contracts, from award through close-out, ensuring compliance with budget, schedule, and technical specs.

  • Oversee contractor adherence to key deliverables, payment terms, reporting cadence, and site-specific protocols.

About You

  • B.S/B.E/B.A degree in engineering discipline with preferred construction management qualification.

  • 7+ years managing hyperscale, semiconductor or mission-critical construction projects.

  • Deep knowledge of CSA and MEP construction phases, procurement workflows and cost controls.

  • Proven record of delivering fast-track projects in multiple geographies.

  • OSHA 30 (or equivalent) and strong familiarity with NFPA 70E, local codes, permit processes.

  • Exceptional field-leadership, subcontractor-management and communication skills.

  • Able to read BIM/Revit models and interpret IFC packages on the fly

  • Travel 50 %+ to active sites or as needed for projects.

Salary & Benefits

  • Competitive total compensation package (salary + equity).

  • Retirement or pension plan, in line with local norms.

  • Health, dental, and vision insurance.

  • Generous PTO policy, in line with local norms.

The base salary range for this position is $120,000 - $200,000 per year, depending on experience, skills, qualifications, and location. This range represents our good faith estimate of the compensation for this role at the time of posting. Total compensation may also include equity in the form of stock options.

We are committed to pay equity and transparency.

Fluidstack is an Equal Employment Opportunity Employer. All qualified applicants will receive consideration for employment without regard to race, color, religion, sex, national origin, sexual orientation, gender identity, disability and protected veterans’ status, or any other characteristic protected by law. Fluidstack will consider for employment qualified applicants with arrest and conviction records pursuant to applicable law.

You will receive a confirmation email once your application has successfully been accepted. If there is an error with your submission and you did not receive a confirmation email, please with your resume/CV, the role you've applied for, and the date you submitted your application-- someone from our recruiting team will be in touch.

Skills

BimChange-order ManagementConstruction ContractsCost ControlsCSAEarned Value ManagementIFCMEPMS ProjectNFPA 70EOSHA 30Permit ProcessesPrimavera P6Procurement WorkflowsQA/QCRevitRFISubcontractor Management

Explore related jobs

Browse these categories

Market data for this role

All reports →