Jobless Developer
TIS GmbH logo

Posted 6 days ago

Open

Project Engineer Onshore Cable Installation (HVDC Grid Connections, Germany)

BerlinHybridContract

AI Summary

Provides technical review and assessment of onshore cable installation campaigns for HVDC grid connection projects, supporting a transmission system operator's engineering decisions.

About this role

Location: Remote, with travel in northern Germany and to Berlin (approx. 10%)
Start: End of 2026
Duration: Until December 2031, extension possible
Workload: Approx. 175 days per year, split equally across two projects
Contract: [Freelance]

About the role

T.I.S. GmbH is looking for a Project Engineer for the onshore cable installation scope of two HVDC grid connection projects in the German Baltic Sea region. You work on the owner’s side for a German transmission system operator and provide the technical review of the cable supplier’s onshore installation campaign. Your assessments are the basis for the client’s technical decisions.

Your tasks

  • Prepare technical assessments and analyses for the planning and execution of onshore cable installation

  • Develop and document installation concepts, interface requirements and implementation approaches

  • Review engineering documents, installation procedures and method statements from the cable supplier and its subcontractors

  • Clarify engineering, execution and interface topics with the cable supplier and other contractors

  • Analyse technical and interface risks and propose mitigation measures

  • Prepare technical recommendations and decision-support documents for the client

  • Prepare and review technical specifications for cable installation

  • Document technical findings, quality observations and compliance with standards and permit conditions

What you bring

  • Degree in a relevant field, such as mechanical, electrical, offshore or subsea engineering

  • At least 5 years of experience in onshore power cable installation projects in a technical, engineering or project execution role

  • Demonstrated experience with cable pulling into cable ducts

  • At least 2 years working on behalf of a transmission system operator or comparable asset owner on onshore transmission or renewable energy projects

  • Experience with high-voltage or extra-high-voltage onshore cable projects, covering civil works, installation, testing and commissioning

  • Experience with interfaces between cable systems, substations, permitting and construction

  • English at C1 level, written and spoken

  • Knowledge of German construction law and permitting procedures. German language skills are a strong advantage.

How to apply

Upload your CV with project references for each relevant project: subject of the contract, period, client, your role and a short description of your activity. The client assesses candidates on these references.

Skills

Cable Installation Testing And CommissioningCable Pulling Into Cable DuctsEngineering Document ReviewEnglish C1 LevelExtra-high-voltage Cable SystemsGerman Construction LawHigh-voltage Cable SystemsInterface ManagementMethod Statements ReviewOnshore Power Cable InstallationPermitting ProceduresTechnical Risk Analysis

Explore related jobs

Browse these categories

Market data for this role

All reports →